The asphalt mixing plant works according to steps, which can ensure the construction quality and prevent damage to the mixing plant. Although the construction points are very important, the construction points of the asphalt mixing station should also be used flexibly.
Before operation, the collapsible loess on the top of the inner wall of the asphalt mixer construction area should be cleaned up. If the ground is too soft, the roadbed should be structurally reinforced to prevent construction machinery from being unbalanced and to keep the piles upright. Subsequently, the construction equipment for the incoming works needs to be inspected, installed and commissioned under specified conditions.
The construction setting out of the asphalt mixing station should be carried out according to the pile position plan, and the deviation shall not exceed 2CM. The asphalt mixer is equipped with 110KVA construction power supply and Φ25mm water pipe to ensure normal and stable power supply and various transportation management methods.
When the asphalt mixing station is ready to be in place, the mixer motor can be turned on, the soil is pre-mixed using wet spraying and moved downward; after the mixing shaft moves down to the design depth, the mixer can be gradually moved to a depth of 0.45~0.8m. /min Drilling and anchor blasting speed.
Contact:David
Phone:+86-186 2556 6107
WhatsApp:+86-186 2556 6107
Email: enquiry@camery-machinery.com
Add:Xingyang city, Zheng Shang Road and Xingmi Road intersection 600 meters west road north. Henan, China.